Nilgiri Hydro Power
The Nilgiri hydropower project is actually a complex of two run-of-river hydropower projects, Nilgiri Khola-I and Nilgiri Khola-II, located on the Nilgiri river in Myagdi, Nepal. The projects, with a combined capacity of 113 MW, are operated by Nilgiri Khola Hydropower Company Limited. The project is notable for its relatively low cost per MW compared to other projects in Nepal and have been connected to national grid since 2024.
Involvement
- Involved in planning, installation, and testing of HM equipment and steel structures as per drawings and technical specifications.
- Executed planning and supervision of gantry and hoisting structure installations for Vertical Pressure Shaft systems.
- Collaborated with technical teams to resolve complex on-site issues during the testing phase of HM components.
- Handled site mobilization, coordination, and execution of project activities, including issue resolution with stakeholders.
- Supervised subcontractors for HM installation and fabrication work, ensuring quality standards and NDT compliance.
- Prepared and reviewed technical documents and inspection reports for installed components.
- Maintained proper documentation, manuals, and records related to installation, testing, and commissioning.
- Regularly monitored project progress, delays, and quality benchmarks against planned schedules.
Software Used
- AutoCAD – For reviewing fabrication and installation drawings
- MS Excel, Word, PowerPoint – For reporting, scheduling, documentation, and planning




